At our demonstration-scale facility in Madison, Pennsylvania, which we refer to as Lighthouse, we operated our technology platform to produce ethanol for over 15,000 hours. At this facility we converted a wide variety of feedstocks, including wood chips, wood waste, sorted municipal solid waste, and natural gas, into ethanol.
We are designing our first commercial facility, Flagship, based on the successful operation of Lighthouse and plan to begin construction in 2012. Flagship is being designed to be capable of producing up to 78 million gallons of ethanol per year when fully built out. The initial production capacity of Flagship will be 16 million gallons, representing a single integrated production line, and will be built out in a subsequent phase to reach its total production capacity. We have secured a site in Boligee, Alabama, received all pre-construction permits, engaged Fagen, Inc. to provide a fixed-price, date certain engineering, procurement and construction contract, and are negotiating multi-year, 100% feedstock procurement and offtake contracts.
 |
 |
|
Coskata's semi-commercial facility
is located in Madison, Pennsylvania,
thirty miles southeast of Pittsburgh.
|
Coskata’s pilot facility is located
at its Global Headquarters
in Warrenville, Illinois. |